ICT and electronic security across three City Rail Link stations — 150 access-controlled doors, approximately 2,000 metres of data cable and 1,000 metres of fibre, delivered under rail assurance requirements.
City Rail Link is the largest transport infrastructure project in New Zealand's history. Our package covered the ICT and electronic security infrastructure across three stations — access control, CCTV, structured cabling, fibre backbone and communications room fit-out.
Rail work is documented work. Every door was commissioned against its own test sheet and witnessed. Every cable run was recorded and handed over as-built. Site access was staged around civil and fit-out trades, and every crew member held current rail inductions.
The scale of the door package is what makes this project a useful reference. 150 access-controlled doors across three stations, each with its own hardware type, interfaces and egress requirements, all commissioned and signed off.
Scope delivered
- 150 access-controlled doors — readers, maglocks, strikes, REX, contacts
- Approximately 2,000 metres of structured data cabling installed and tested
- Approximately 1,000 metres of fibre optic backbone, spliced and certified
- IP CCTV to platform, concourse, plant and back-of-house areas
- Communications room fit-out — racks, patching, containment and power
- Fire alarm, lift and building system interfaces verified per door
- Full ITP, witness test and as-built documentation package
Project detail
| Client sector | Rail and transport infrastructure |
|---|---|
| Stations | Three |
| Access-controlled doors | 150 |
| Data cable | ~2,000 metres |
| Fibre | ~1,000 metres |
| Assurance | ITP-driven, witnessed testing, controlled as-builts |
Outcome
- 150 doors commissioned and witnessed
- Three stations delivered
- Full assurance documentation handed over
What the head contractors said
Namra and his team played a critical role in helping us maintain momentum during a particularly challenging stage with an aggressive timeline. What truly stood out was Namra's hands-on leadership, he was consistently on the ground with his crew, actively driving progress and ensuring issues were addressed promptly.
The technicians from 369 Infrastructure consistently demonstrated high levels of professionalism, technical competence, and a strong commitment to safety and quality standards. I have no hesitation in recommending Namra Shah and 369 Infrastructure for similar roles on future projects.
Comparable scope on your project?
Send the drawings and specification. We will price it against work we have already delivered.
Request a quote